UPAC CASE STUDIES
Our customer required protection of completed commercial goods lift from the elements. A period of time that that could be anywhere from weeks to months long. From the time of manufacture, during transport, during the installation process, right up until the building has reached lock up stage. The existing system was not presentable and would blow away in the wind in transit and not protect the lift while on site in the weather for up to 3 months
The UPAC solutions team came up with a system that exceeded the customers’ expectations and has stood the test of time. A heat shrink wrapping system that protects the steel, the electronics, the hydraulics and the paintwork in rain, hail and shine. Durafoam corner pieces prevent the corners of the frame puncturing the film. This has now been used satisfactorily for over 10 yrs.
Impact prevention & surface protection
CONTACT UPAC TODAY
13 Blackmore Rd,
Smeaton Grange,
NSW 2567, Australia
13 Blackmore Rd, Smeaton Grange, NSW 2567, Australia